menu
  • university-toledo-student-union-1
  • university-toledo-student-union-2
  • university-toledo-student-union-3

Student Union - The University of Toledo

Phase I of this project consisted of restoration of the original entrance plaza at the Student Union, including pointing and cleaning of the entrance porch, restoration of the Lannon stone planters and retaining walls, and replacement of plaza deck and stairs. Deck and wall surfaces protecting lower level rooms were waterproofed along with retaining walls. Phase II included the addition of historically sensitive and energy efficient windows, and replacement of major entry doors.

Download Project Sheet

Team Members

  • Michael Duket
  • Jerry Voll

Consultants

  • JDRM Engineering
  • LKL Engineers